Flows and Connectivity · Application: Project Selection
Lesson 5
Problem. Consider the following eight projects:

What is the maximum total profit of a valid subset of projects?
Hint:

Flows and Connectivity · Application: Project Selection
Problem. Consider the following eight projects:

What is the maximum total profit of a valid subset of projects?
